m-d-s.co.za

Precision Engineered, Innovation Delivered

Early Return Assembly ER

Operation facilities:

  • injection and diecasting moulds
  • prevents damage of mould cavities and ejectors
  • valve plates
  • moulds with multistage mould releasing movement
  • early ejector return assemblies save you time and money
  • unique design permits low costs
  • long life due to precise parts and hardened surfaces
  • prevents valuable mould components from mechanical damage
REF A B C D E F G H
ER100E 32 35 24,2 24 27 10 5 17
ER101E 42 46 32,2 32 36 16 7 24
Ex.N30 X1 Y1 X2 Y2 X3 Y3 X4 Y4
66 36 2,5 40 6,5 46 2,5 50 6,5
86 56 2,5 60 6,5 66 2,5 70 6,5
106 76 2,5 80 6,5 86 2,5 90 6,5
126 96 2,5 100 6,5 106 2,5 110 6,5
  1. Four units minimum per mould are preferred—Two units per mould mounted on the centerline of the mould are a must
  2. Use guided ejection in the ejector assembly
  3. Use only in a horizontal press
  4. If used in an unbalanced mould—Uneven loading could occur
  5. Lubricate occasionally with a lithium type grease
  6. Timing is critical: all units to be timed within ±0,013mm of one another
  7. No preload of unit
Spare Parts
Bushing Post Pin Set: cam finger washer,
upper and lower snap ring
ERB100E ERS 100 E EPA 05 ER 100 RK E
ERB101E ERS 101 E EPA 05 ER 101 RK E